Quality

The occupancy board failed.The serial is on the traveler.

Electrical test on every board. Rework is written against that serial. If the board transmits, a named engineer released the radio.

Process

ISO, labor, test, and radio

ISO 9001:2015

Assembly is written down. First articles go through it. If a wall sensor or a wearable comes back, rework is written against that serial.

amfori BSCI

Hours, labor, and workplace rules on the line that placed the parts.

Electrical test

Every board. Serialization starts at first articles.

Wireless

BLE, Wi-Fi, Thread, cellular on a pre-certified module. A named engineer releases it before assembly starts. Geometry keepout is an engineer lane. Wireless